Horwath HTL Planning and Development

  • V&A Waterfront, Cape Town

    V&A Waterfront, Cape Town

    Office: Horwath HTL South Africa

    Scope of work: Hotel Operator Identification, Selection and Appointment Market Intelligence ~ Urban Design Strategy Potential Hotel Development Opportunity Report

    Description of project: Since inception in 1989, the V&A Waterfront precinct has been successfully developed to encompass a large variety of mixed-uses and activities, including retail, commercial, leisure and hospitality, residential, and a working harbour. On two occasions, the Client considered incorporating additional Hotel developments within the Clock Tower Precinct of the Victoria & Alfred Waterfront. In the first instance, Horwath HTL was appointed to facilitate the hotel operator identification, approach, selection, and appointment process. In the second instance, Horwath HTL was engaged to “test” the hotel concept, associated proposed design elements, and functionality of the proposed scheme from a hotel operations perspective, make recommendations with regard to the proposed positioning, identify potential hotel operators most suited to such a hotel development, and approach these hotel operators to gauge their interest in the opportunity. The Client wished to review and explore urban design proposals for the development of the remaining bulk in the V&A Waterfront precinct. Horwath HTL (South Africa) was tasked with providing an analysis of the then current and anticipated future hospitality environment in the immediate surrounding areas of Cape Town CBD, Foreshore, and the Atlantic Seaboard in addition to the V&A Waterfront precinct. Following the most recent acquisition of the V&A Waterfront, the new Owners commissioned Horwath HTL to prepare a report which would provide the Client with insights into the Western Cape hotel environment which would assist them in evaluating the future development potential of the precinct’s hospitality offering.

  • One & Only Cape Town, Cape Town

    One & Only Cape Town, Cape Town

    Office: Horwath HTL South Africa

    Scope of work: Market Analysis and Financial Feasibility Study

    Description of project: Located in the Victoria & Alfred Waterfront the One&Only Cape Town comprises 91 guestrooms and suites situated in the Marina Rise and a further 40 guestrooms and suites situated on the exclusive Island. An all-day dining restaurant by local celebrity chef Reuben Riffel, the speciality Nobu restaurant by Michelin-starred chef Nobu Matsuhisa, alfresco dining at Isola, and Vista - the lobby lounge/ bar area provide for guests’ food and beverage requirements. Conference/ banquet and meeting rooms are also provided for. Among the hotel’s leisure facilities, a day spa complete with yoga pavilion and relaxation rooms is complimented by a beauty centre and stated of the art fitness centre. KidsOnly provides a supervised program for children aged 4 – 11.

    Project status: Open

  • Hyatt Regency Oubaai Golf Resort & Spa, Herolds Bay

    Hyatt Regency Oubaai Golf Resort & Spa, Herolds Bay

    Office: Horwath HTL South Africa

    Scope of work: Market Analysis and Financial Feasibility Study

    Description of project: Located near George along the famed Garden Route, the 100-key Hyatt Regency Oubaai Golf Resort and Spa is set on a 316-acre residential and golf development. The Resort features Ernie Els’ first signature 18-hole golf course, a Lifestyle Centre, and Golf Academy. The residential component of the development comprises villas, apartments, and a Village Market. The hotel includes two restaurants, a bar, one ballroom, five meeting rooms, a chapel, and the Oubaai Clubhouse.

    Project status: Open

  • Windhoek, Namibia – Hilton Hotel Windhoek

    Windhoek, Namibia – Hilton Hotel Windhoek

    Office: Horwath HTL South Africa

    Scope of work: Market Analysis and Financial Feasibility Study

    Description of project: The hotel is centrally located in the country’s capital city, Windhoek. The 154-key hotel is set among a mixed-use development which includes many blue chip company offices. The hotel includes five food and beverage outlets, including a rooftop terrace and bar, conference and meeting facilities, Wellness Centre, and Fitness Centre.

    Project Status: Open

  • Kampala, Uganda – Intercontinental Hotel Kampala

    Kampala, Uganda – Intercontinental Hotel Kampala

    Office: Horwath HTL South Africa

    Scope of work: Market Analysis and Financial Feasibility Study

    Description of Project: The hotel component of this mixed-use project will be included in the final phase (Phase III) of this development. On completion the hotel will be located adjacent to the convention centre developed in Phase II and comprise some 350 guestrooms and suites, all-day dining restaurant, speciality restaurant, a conference room, approximately twenty meeting rooms, a business centre, health spa, and fitness centre.

    Project Status: Phase I of the project has commenced

  • Mauritius – St. Regis Mauritius Resort

    Mauritius – St. Regis Mauritius Resort

    Office: Horwath HTL South Africa

    Scope of work: Market Analysis and Financial Feasibility Study

    Description of project: The project site is located in close proximity to the Le Morne World Heritage Site situated in the south of the Island. The hotel comprises approximately 173 guestrooms, suites and villas; an all-day dining Creole style restaurant; a Pan-Asian restaurant; an Indian-styled restaurant; beach restaurant and bar; a main bar in addition to a wine bar; ballroom; health and beauty spa; fitness centre; diving centre; and kids club.

    Project status: Open

  • Maasai Mara, Kenya – The Address Maasai Mara by African Dream Collection and Emaar Hospitality Group

    Maasai Mara, Kenya – The Address Maasai Mara by African Dream Collection and Emaar Hospitality Group

    Office: Horwath HTL South Africa

    Scope of work: Market Analysis and Financial Feasibility Study

    Description of project: Our Client had secured a 220 000 square meter parcel of land situated on the Oloololo Escarpment in Kenya overlooking the Maasai Mara National Park. The project, upon completion, is envisioned to comprise thirty-eight luxury guest pavilions, three food and beverage experiences, sun-downer terraces, a health spa comprising four treatment rooms, a thermal suite, fitness centre and change rooms in addition to the ancillary areas associated with such a development. Our Client, in partnership with African Dream Collection, required an independent assessment of the project’s viability.

    Project status Currently under construction

  • Bamako, Mali – ACI2000 District Dry Hotel Development

    Bamako, Mali – ACI2000 District Dry Hotel Development

    Office: Horwath HTL South Africa

    Scope of work: Market Analysis, Concept Refinement and Financial Feasibility Study

    Description of project This mixed-use development is envisioned to include the first shopping mall in Mali, the proposed hotel, and a number of townhouses. The project is situated to the west of Bamako’s city centre in the ACI2000 District.

    Project Status: Construction on-going

  • Accra, Ghana – Radisson Blu Accra Hotel

    Accra, Ghana – Radisson Blu Accra Hotel

    Office: Horwath HTL South Afria

    Scope of work: Market Analysis and Financial Feasibility Study Management Agreement Review and Negotiation

    Description of project Our Client was contemplating the development of a business hotel situated on High Street in the capital city of Ghana. Upon completion the hotel is envisioned to comprise approximately 136 guestrooms, 12 suites, 20 apartments, food & beverage outlets and conference facilities. Subsequent to our study, our Client secured a second site at Accra’s Kotoka International Airport which is likely to be the site of this proposed hotel. Our Client wished to enter into a management agreement with Carlson Rezidor to manage the proposed hotel under the Radisson Blu brand. Horwath HTL (South Africa) was tasked with negotiating the commercial terms of the management agreement on behalf of our Client.

    Project status: Construction anticipated

  • Sochi, Russia Sochi – Adventure Theme Park and Resort

    Sochi, Russia Sochi – Adventure Theme Park and Resort

    Office: Horwath HTL Hungary & Russia

    Scope of Work: Market and Financial Feasibility Study for an extensive Sea-Side Resort project in Sochi.

    Description of Project: Horwath HTL Russia has been requested by the developer to prepare a market and financial feasibility report for a 280-key themed hotel complex, a Theme Park on 19 hectares supplemented with an extensive Retail and Entertainment Promenade at the seaside in the new emerging part of Sochi.

    Status: Resort is under development

  • Krasnaya Polyana, Russia – Gorky Gorod Mountain Resort

    Krasnaya Polyana, Russia – Gorky Gorod Mountain Resort

    Office: Hungary & Russia

    Scope of Work: Market and Financial Feasibility Study for the most complex tourism-related project in Krasnaya Polyana including the facilities for Sochi 2014 Winter Olympics.

    Description of Project: Horwath HTL Russia has been requested by one of the largest banks in Russia to prepare a market and financial feasibility report for an extensive resort complex comprising 12 hotels (3-4-5-Star) offering a total of 1,600 hotel rooms, 2,000 apartments, villas & chalets, a Spa Village, a Retail and Entertainment Centre and Ski Infrastructure.

    Status: Resort is under development

  • Marne-la-Vallée, France – Research and assistance of the project of relocation  of Rolland Garros Stadium

    Marne-la-Vallée, France – Research and assistance of the project of relocation of Rolland Garros Stadium

    Office: Horwath HTL France

    Scope of Work: The French Federation of Tennis launched a tender to relocate the international tournament of Roland Garros in a larger site as the 8-hectare site situated in the south west of Paris (Porte d'Auteuil) is not well adapted to host such a large event.

    Description of Project: Horwath HTL assisted the public development authority of Marne-la-Vallée in their bid to host the new stadium, the French Tennis Federation and the tournament. Horwath HTL designed a leisure and sport planning to keep the site attractive all year round.

    Project Status: The FFT finally decided not to relocate the tournament due to incremental space granted by the City of Paris. Marne la Vallee was ranked as the best alternative.

  • Disneyland Paris, France – Impact Study of a Mega Self-contained Resort

    Disneyland Paris, France – Impact Study of a Mega Self-contained Resort

    Office: Horwath HTL France

    Scope of Work: The Villages Nature resort is planned near Disneyland Paris. The project represents one of the most ambitious European self-contained resort combining accommodation and leisure facilities. Disneyland Paris and Pierre & Vacances jointly appointed Horwath HTL to provide an impact study for the project and related facilities.

    Description of Project: A 16-hectare land dedicated to the theme of nature and centred on one of the most important water parks in Europe; 30 000 m² of surface including 1730 lodging units (710 apartments and 1020 cottages) developed in 4 clusters.

    Project Status: Scheduled for opening in 2016

  • Mumbai, India  Trident, BKC

    Mumbai, India Trident, BKC

    Office: Horwath HTL India

    Scope of Work: Market and Financial Feasibility Study

    Description of Project: Analysed Mumbai hotel market and prepared the financial feasibility study for Trident Hotel at BKC. This involved performance estimates, cash flow projections and ROI forecast.

    Project Status: Hotel is operational

  • Bengaluru, India  Sheraton at Brigade Gateway

    Bengaluru, India Sheraton at Brigade Gateway

    Office: Horwath HTL India

    Scope of Work: Market and Financial Feasibility Study

    Description of Project: Sheraton at Brigade Gateway a 230 room hotel is a part of large mixed use development with about 1 mn sft of office space. We were involved in conducting the market and financial feasibility study for the hotel project.

    Project Status: Hotel is operational

  • Zürich, Switzerland  4* Design Hotel

    Zürich, Switzerland 4* Design Hotel

    Office: Horwath HTL Switzerland

    Scope of Work: Feasibility Study & Project Conceptualisation, Operator Search & Selection

    Description of Project: Redevelopment of an old, run down hotel plus one adjacent building in the heart of old-town Zürich into a City Design Hotel consisting of 93 rooms (90 double rooms, 3 suites), restaurant, bar/club

    Project Status: Converted to luxury residences

  • Zürich, Switzerland  Kongresshaus

    Zürich, Switzerland Kongresshaus

    Office: Horwath HTL Switzerland

    Scope of Work: Financial Feasibility Study

    Description of Project: New Congress Centre planned by the City of Zürich

    Project Status: The project was stopped by political referendum